Walkthrough

Does my walkthrough support the conclusion I’ve written?

Works in Microsoft 365 Copilot · Copilot in Excel · Claude · ChatGPT · Gemini

The problem

One transaction traced cleanly, and the workpaper now says the control “operated effectively throughout the year”. Or the narrative says the Controller approves, but the system shows someone else did. A walkthrough supports less than people often write.

How it helps

  • Lines up each step of the narrative with what the records show.
  • Flags a different approver, a skipped step or a missing record — and accepts documented, explained differences.
  • Concludes on design and implementation, and tells you what testing would be needed for a full-year conclusion.

What you get back

A step-by-step trace
Narrative versus records, with the source for each step.
Design and implementation conclusions
Each one supported, not supported, or unresolved — with the reason.

How to use it

  1. Add the skill to your AI tool

    Pick the tool you use. It takes a minute, once. If your tool lets you choose a model, choose its newest, most capable one.

    USE THE SKILL

    Works where you already work.

    1. Download the skill file below.
    2. In Microsoft 365 Copilot, open Agents & Skills → New agent (or open an agent you already use), then go to Configure → Skills → Add and upload the file.
    3. Use Try it, or open the agent, attach your files and ask.

    Custom skills in Copilot agents are a Frontier preview; your admin may need to turn them on.

    Download for Microsoft 365 Copilot
  2. Attach your files and ask

    Ask in plain words, the way you would ask a colleague. For example:

    Review walkthrough.md against process-and-criteria.md, journal-detail.csv and event-log.csv. Can I keep the preparer’s conclusion for the annual report, or what should it say?

    Use synthetic data, or data you are approved to share with your AI tool.

  3. Review what comes back

    The answer is a draft for you to check. You decide what goes in the workpaper.

See a worked exampleA synthetic case: the request, the files, and the actual answer.

The case: One journal walkthrough cannot establish full-year operation

Auditor's request: Review walkthrough.md against process-and-criteria.md, journal-detail.csv and event-log.csv. Can I retain the preparer conclusion for the annual report, or what should it say?

walkthrough.md

WP-WT-JE-01 | prepared by Lene Ash, 20 October 2026; audit review pending.
Observed JE-261020-07 end to end. CALC-MAINT-1020 comprised three open service orders; their amounts summed to $18,450 and the Controller checked them against the accrual. Debit and credit balanced; account coding matched the chart. Approval occurred before posting and the actors differed. System history and the direct observation agreed.
Preparer conclusion: The manual journal approval control is designed appropriately and operated effectively throughout 2026. No further operating testing is necessary because the walkthrough had no exceptions.

process-and-criteria.md

All companies, people and records are synthetic. Internal use within this fictional engagement is approved.
Company: Copperwren Packaging, a manufacturing business. Annual engagement: calendar 2026 manual journal-entry approval. Walkthrough performed 20 October 2026.
JE-04 v3 section 3 requires the Controller, independent of the preparer, to inspect support, account coding, amount and rationale and approve before posting.
Narrative PN-JE-v2: GL accountant creates a draft with supporting calculation; the Controller checks support and accounting and approves in ERP. ERP blocks posting until approval and blocks self-approval. GL accountant then posts the unchanged approved entry. Edits invalidate approval. Finance has designated Controller deputies in the approved delegation list.
Auditor Lene Ash inspected the effective delegation list and read-only ERP settings CFG-JE-1020 on 20 October. They matched this design. She observed creation through posting of JE-261020-07 and traced its support and history. No other journals, periods, populations or operating samples have been examined. The year is still in progress.

event-log.csv

event_idjournal_idevent_ateventactorroledetail
JE-E01JE-261020-072026-10-20T09:00:00-05:00draft_createdMaren QuillGL AccountantSupport CALC-MAINT-1020 attached
JE-E02JE-261020-072026-10-20T10:15:00-05:00approvedTarin ValeControllerChecked vendor schedule; coding; amount; rationale
JE-E03JE-261020-072026-10-20T11:00:00-05:00postedMaren QuillGL AccountantNo changes since approval

journal-detail.csv

journal_identry_datelineaccountdescriptiondebit_usdcredit_usdsupport_reference
JE-261020-072026-10-2015105October machine-maintenance accrual18450.000.00CALC-MAINT-1020
JE-261020-072026-10-2022150Accrued maintenance payable0.0018450.00CALC-MAINT-1020

Paste into Claude, Copilot, ChatGPT or Gemini.

The answer

Actual output, unedited apart from the template’s wrapper tags. Claude Sonnet 5.5 with the Review Kit prompt v0.7.1, run on this synthetic case. It passed blind checks by GPT-6.1 Sol and Claude Opus. AI output is a draft for auditor review.

Review of WP-WT-JE-01

Short answer: Don't retain the preparer conclusion as written. Keep the design and implementation parts. The operating-effectiveness claim and the "no further testing" sentence are not supported and should be removed.

<walkthrough-review> **Control:** Manual journal-entry approval (JE-04 v3 §3; narrative PN-JE-v2). The Controller, independent of the preparer, inspects support, coding, amount and rationale, and approves before posting. ERP blocks posting until approval and blocks self-approval. **Risk addressed:** unauthorised or erroneous manual journals posting to the ledger.

Transaction traced: JE-261020-07, 20 Oct 2026, $18,450.00 (October machine-maintenance accrual, Dr 5105 / Cr 2150).

StepNarrative saysRecords showMatch?Source
1. Draft with supportGL accountant creates draft with supporting calculationMaren Quill (GL Accountant) created draft 09:00 with CALC-MAINT-1020 attachedYesevent-log.csv JE-E01; journal-detail.csv lines 1–2
2. Controller reviewController checks support and accountingTarin Vale (Controller) approved 10:15, noting "vendor schedule; coding; amount; rationale". This covers all four JE-04 attributes.Yesevent-log.csv JE-E02; process-and-criteria.md
3. IndependenceApprover is not the preparer; ERP blocks self-approvalApprover and preparer are different people. The block itself was seen through settings CFG-JE-1020, as reported in the workpaper.Yes (documented)event-log.csv; process-and-criteria.md; WP-WT-JE-01
4. Approval before postingERP blocks posting until approvalApproval 10:15, posting 11:00YesJE-E02, JE-E03
5. Post unchanged entryGL accountant posts the unchanged approved entry; edits invalidate approvalMaren Quill posted 11:00, "No changes since approval"YesJE-E03
6. Amount and balanceSupport agrees to the entryDr 18,450.00 = Cr 18,450.00. The workpaper reports that CALC-MAINT-1020 (three open service orders) sums to $18,450.Yes (support is documented, not supplied here)journal-detail.csv; WP-WT-JE-01
7. Deputy arrangementDelegation list designates deputiesThe delegation list was inspected per the workpaper. No deputy was involved in this journal.Not exercisedprocess-and-criteria.md

Differences:

  1. None between the narrative and the records for this journal.
  2. Observation only: the event log describes the Controller's check as a "vendor schedule", while the workpaper describes it as three open service orders. These are probably the same support. CALC-MAINT-1020 was not in the material, so I have relied on the workpaper's documented reference. This does not change any conclusion.

Contrary evidence: none found in the material.

Design conclusion: Effective, as described and as at 20 Oct 2026. The approver is independent, the check covers support, coding, amount and rationale, and it is preventive (ERP block before posting). The workpaper reports that the delegation list and CFG-JE-1020 matched the narrative. The conclusion covers the configuration as inspected on that date. It says nothing about earlier or later changes to the configuration or delegation list.

Implementation conclusion: Implemented as described, based on one journal observed from creation through posting on 20 Oct 2026. No deputy-approval path was observed.

Operating effectiveness: Not assessed by a walkthrough. The draft's claim that the control "operated effectively throughout 2026" is unsupported for these reasons:

  • The evidence is one journal on one day. The process-and-criteria file states that no other journals, periods, populations or operating samples were examined.
  • The year is still in progress, so the claim reaches dates that have not yet happened.
  • "No exceptions" in a single item does not support "no further testing". The walkthrough has no test population, so it cannot show a deviation rate against a tolerable rate.

Next step: test operation across the period. Under your methodology, this would normally include:

  • Population: an ERP report of all manual journals posted in 2026, with a completeness check.
  • Attribute sample: approval before posting, approver independent of preparer (or valid deputy), evidence of the four review attributes, and no edits after approval. Use the acceptance number and tolerable rate your plan sets.
  • System controls: change history for the approval and self-approval settings (CFG-JE-1020) and for the delegation list across 2026, so the walkthrough-date configuration can be extended to the period.
  • Roll-forward: cover the period after the interim test through year-end.

Questions for the auditor:

  1. Decision: do you want operating-effectiveness testing as described above, covering Jan–Oct as interim and Nov–Dec as roll-forward? I recommend yes, because the control is relied on for the annual conclusion and nothing else in the file covers the period.

Suggested replacement wording for the report: "Walkthrough WP-WT-JE-01 (20 Oct 2026) traced one manual journal (JE-261020-07, $18,450) from creation to posting. The control, as described and as configured at that date, is appropriately designed and was implemented as described. No exceptions were noted in the item traced. The walkthrough does not support a conclusion on operating effectiveness for 2026. That conclusion depends on testing across the period, which is [planned/in progress]."

Draft for auditor review. The auditor owns the conclusion. </walkthrough-review>

Blocking items before the report can proceed: none for the revised wording. Only the original operating-effectiveness sentence needs to be removed. Note also that the workpaper is still marked "audit review pending", and a review by me is not an independent review.

Good to know

  • It drafts and checks. It does not sign off, rate final severity or replace your judgment.
  • Use the newest, most capable AI model you have access to. In our testing, completeness and accuracy varied a lot between models, and answers on detailed workpapers can still contain small errors — check figures, dates and IDs against your files.
  • The skill is plain files. It sends nothing to Audvera. Your AI provider’s terms apply to what you share with it.
  • Every skill is tested before release. See how.
Tell us how it wentFeedback on the example only. Please do not paste client or employer material.

HELP IMPROVE THE SKILL

Was the example helpful?

Feedback on the synthetic example only. Please do not paste client or employer material.

Your feedback
Optional context and contact

The skills help one reviewer. Audvera keeps the evidence trail for the whole team.

Explore Audvera